Stelzentunnel Tunnel Maintenance

Protecţia la impact - Stelzentunnel Tunnel Maintenance 2017

Stelzentunnel: driving lanes and the construction site area are separated from each other and ensure safety on both sides. In the picture: before extending the panels to the required height

Protecţia la impact - Stelzentunnel Tunnel Maintenance 2017

Bottom: standard «step» concrete element; top: braced against the ceiling

Protecţia la impact - Stelzentunnel Tunnel Maintenance 2017

The rapid construction and mobility of the system require only short road closures in the tunnel

Protecţia la impact - Stelzentunnel Tunnel Maintenance 2017

Fence panels with wooden boards - they protect the traffic from dust and water of the construction works and withstand the airflow of the trucks.

Protecţia la impact - Stelzentunnel Tunnel Maintenance 2017

Close-up panel with formwork panels

 

Sisteme

Soluţii speciale Mobile Road Fencing

 

Anul instalării

2017

Situația inițială

One of Switzerland's central motorways runs through the Stelzentunnel near Zurich. Since 2017, the Stelzentunnel (1.6 km long) has been renovated in stages.

A mobile protective fence separates the trafficable lanes from the construction site. One of the requirements of this protective fence was that it could be erected quickly so that the motorway only needs to be closed for a few hours.

Descriere

Geobrugg optimized the design of the mobile debris fence used at motorsport venues to comply with the requirements for road works in a tunnel. The NORDBETON motorsport concrete barriers have been changed to standard NORDBETON public roadwork concrete barriers. Additionally, the debris fence panels have been extended to the on-site tunnel height and stabilized accordingly. They are telescopic and can be braced in the tunnel ceiling. Das System ist in der Höhe zwischen zwei und vier Metern anpassbar.

Client

Arge Nordring Los 4

Antreprenor

Geobrugg AG

Tehnologie

Geobrugg AG

Alte companii implicate

NORDBETON GmbH

Alte aplicaţii instalate

Protecţia la impact

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail