Stabilizacja skarp - Rahovei 20, Cluj-Napoca 2013

Slopes fully protected with soil nailing and GREENAX® mesh (composite with TECMAT® anti-erosion mat)

Stabilizacja skarp - Rahovei 20, Cluj-Napoca 2013

Superficial instabilities and erosion at the slope

Stabilizacja skarp - Rahovei 20, Cluj-Napoca 2013

The vegetation could not stabilize the slope due to very intense sliding and erosion

Stabilizacja skarp - Rahovei 20, Cluj-Napoca 2013

After vegetation removal, soil nails were installed to stabilize the slope globally

Stabilizacja skarp - Rahovei 20, Cluj-Napoca 2013

Because of the geothermal installation it was impossible to install soil nails on top of the slope. The mesh was fixed and tensioned with special setup of the border rope

Stabilizacja skarp - Rahovei 20, Cluj-Napoca 2013

Final tightening of Geobrugg's P33/40 spike plates

Stabilizacja skarp - Rahovei 20, Cluj-Napoca 2013

Another overview of the slope with soil nailing and active protection solution.

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2013

Sytuacja początkowa

This 7 to 8 meters high slope was cut in order to build a private house. Due to the geotechnical data, the slope should have been stable at 40 degrees and  up to 4.9 m. When the owner installed the pipes for a geotermal pump on top of the slope, the slope began to fail.

Geologia

Silt and clay.

Opis zastosowanego rozwiazania

Geobrugg designed and delivered a complete protection system. The solution was a standard soil nailing together with GREENAX® mesh. A total of 229 m² were stabilized using 40 soil nails R32.  They were installed in the pattern of 2.50 x 2.20 m.

Inwestor

Private customer

Wykonawca

S.C. MAVO Transilvania S.R.L.

Chroniony Objekt

Building

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Zenith Proiect and Consulting

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy