スイス
スイス

myGeobrugg

 - Schwieberdingen 2016

TECCO® SYSTEM³ fully installed - visible extra anti-erosion layer of TECMAT®. Both perfectly follow complicated slope geometry, leaving no space for further deformations

 - Schwieberdingen 2016

All TECCO® SYSTEM³ installation works required crane - visible suspended drill rig

 - Schwieberdingen 2016

Mobile drill rig supported by crane - the best solution for such a complicated project

 - Schwieberdingen 2016

Slope with already installed soil nails and anti-erosion TECMAT®

 - Schwieberdingen 2016

Overview of the protected old open pit walls - due to specific slope geometry, extra lacing was introduced

 - Schwieberdingen 2016

Extra stabilized formation from another perspective

 - Schwieberdingen 2016

Slope dell extra filled with shotcrete, to avoid further erosion and to stabilize above lying formations

 - Schwieberdingen 2016

TECCO® SYSTEM³ from another perspective - its perfect visual performance is evident

 - Schwieberdingen 2016

TECCO® SYSTEM³ from another perspective - its multi-functionality is fully visible here

 - Schwieberdingen 2016

TECCO® SYSTEM³ allows very good pre-tensioning, even on very irregular surfaces

 

システム

 

設置年

2016

状況

The apartment house Holdergasse, in Schwieberdingen (near Stuttgart) was built in a former stone quarry in the second half of the 20th century.  At that time, the stone walls were in a good condition.  The first rockfalls occurred some years ago, caused by weather conditions. Extremely loud impacts from rocks concerned the residents.

An initial assessment by the Henke and Partner in Stuttgart, showed that a full area support was necessary.  At the customer’s request, different measurements were evaluated. The comprehensive search for suitable solutions took about two years.  The solution proposed by Henke and Partner including TECCO® SYSTEM³, proved to be the most logical and economical application.

地質

Shell limestone

説明

The rock wall was divided into various areas of protection such as steep rock faces, overhanging formations, layered rocks with covered with with loose soils . Due to the tightness in some areas between the building and the rock face, a suitable solution had to be found here as well.

According to the dimensioning using RUVOLUM® software high tensile steel mesh type TECCO® 65/2 proved to be the most economical solution.

In some areas with overhangs, shotcrete filling had to be planned. The areas with loose rock were additionally covered with the anti-erosion protection mat TECMAT®. Areas where the distance to the building was less than one meter, extra lacing was implemented.
After completion, the initially skeptical residents were enthusiastic about the good adaptation to the terrain. The work was carried out by the company Bramm Bau GmbH.

顧客名

Private

落札者

Bramm Bau GmbH

保護対象

建築, 鉱山/採石場

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Henke und Partner GmbH, Ingenieurbüro für Geotechnik

その他設置済み工法

鉱山および採石場

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム