スイス
スイス

myGeobrugg

 - Perez Caldera 2022

Slope stabilization with TECCO GREEN

 - Perez Caldera 2022

Slope stabilization with TECCO GREEN in Perez Caldera, general view

 - Perez Caldera 2022

The erosion control mat favors revegetation

 - Perez Caldera 2022

The mat retains dust particles and seeds helping, to revegetate the slope

 - Perez Caldera 2022

General view on the stabilized slope.

 - Perez Caldera 2022

Connections of TECCO GREEN mesh rolls

 
 

設置年

2022

状況

Slope stabilization was necessary at the Perez Caldera mining camp. These slopes are on the side of a road that pedestrians and light vehicles use.

説明

The solution defined was installing TECCO GREEN - a mesh system with an erosion control mat- to stabilize, minimize the environmental impact, avoid using shotcrete and allow the revegetation of the slopes.

顧客名

落札者

Climbers

保護対象

道路, 建築, インフラ

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム