スイス
スイス

myGeobrugg

 - Muriwai Drive 2019

Looking east up the property - note pressure post and undulating allignment

 - Muriwai Drive 2019

Close up of post base - note drag net and proximity to property boundary

 - Muriwai Drive 2019

Looking north - fence allignment and gap fill kit

 

システム

 

システム延長

16 m

 

設置年

2019

状況

A rock and tree fall hazard on an existing property created the requirement for a custom rockfall barrier. The site was narrow (17 m wide), had difficult access and no flat alignments.

説明

The system selected was a 16 m long, 3 m high GBE-1000A-R with pressure posts, drag nets and a gap fill kit.
Below is a list of custom features:

Fixed Post -  no upslope anchors due to proximity of alignment to property boundary
Pressure Posts - no lateral anchors meant barrier could be installed over full property width
Drag Nets - enabled the shorter barrier to have the required deflection to absorb the 1000 kJ energy event
Gap Fill Kit - enabled the  barrier to contour the difficult alignment

顧客名

Private

落札者

Rock Control, www.rockcontrol.co.nz

保護対象

建築

腐食防止

ジェオブルッグ スーパーコーティング, ジェオブルッグ ウルトラコーティング

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム