スイス
スイス

myGeobrugg

 - El Jocotillo electrical substation 2015

View of the slopes around the power station stabilized with TECCO® SYSTEM3.

 - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 perfectly stabilized very steep slopes.

 - El Jocotillo electrical substation 2015

Another perspective of the electrical substation.

 - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 installation: TECCO® G65/3 secured using system spike plates P33/40.

 

システム

 

設置年

2015

状況

A slope of highly fractured and weathered volcanic rock with continually falling rocks endangered the security of an electrical substation at the bottom of the rock cutting.

説明

Slope stabilization with TECCO® system and anchor bolts D25 [mm] and length 4 [m].

顧客名

Eolic San Antonio

落札者

Grupo PHI S.A.

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Grupo PHI S.A.

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム