Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Yongduam 2015

Protected visitors at Yongduam

Stabilisation des pentes - Yongduam 2015

Safe walking paths

 

Année d’installation

2015

Situation de départ

On Jeju Island, erosion formed a 10 meters high rock into a dragon's head. Yongduam is one of the main tourist attractions of the region. Rockslides threatened sightseers on the surrounding walkways.

For stabilization, the city of Jeju needed an erosion proof solution. The solution should not compromise the scenic beauty of the area.

Description

TECCO® G65/3 STAINLESS was installed in December 2015. 4 meter long galvanized 28 mm nails at intervals of 4 meters (horizontally and vertically) are fixing the mesh. The mesh was colored green and thus is unobtrusive.

Client

*

Objet protégé

Infrastructure touristique

Protection anticorrosion

INOX / STAINLESS

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail