Estados Unidos
Estados Unidos

myGeobrugg

SBB CFF FFS - CMI / EIZ Biasca

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

Over half a kilometer long - the protected area

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

Installation of the mesh

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

The installation requires great care because of the mesh offset

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

Next to the installations, the Cima di Biasca (2,574 meters) rises almost vertically into the air

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

Carefully installed, double-layered and staggered meshes

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

The dam already stabilized in 2018

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

Dam protected with netting (2018) from above

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

The roof under the two layers of mesh protects against sun and rain

Proteção contra impactos - SBB CFF FFS - CMI   EIZ Biasca 2022

View from the protective roof in the direction of Biasca

 

Ano de instalação

2022

Situação inicial

One of Europe’s most important rail links passes through the Gotthard. The maintenance and intervention center of the Swiss Federal Railways (SBB) in Biasca, south of the Gotthard base tunnel, was endangered by rockfall, falling boulders and stone splinters.

In particular, the rocks falling on the building at 280 km/h were an exceptional hazard due to the high speed. The buildings, the track field, and the people working there had to be protected.

Descrição

After extensive planning, it was decided to protect the entire plant over a length of more than 500 meters with a roof made of mesh.

Since the dangerous splinters are relatively small, double and staggered installation was carried out with G65/4 mesh (65 mm opening, 4 mm wire thickness). In total, it was 70,000 square meters for the roof and side skirts.

In 2018, the dam that runs parallel to the plants was stabilized by 8,500 square meters of G65/4 mesh.

Objecto protegido

Caminho de ferro, Infra-estrutura

Outras empresas envolvidas

Outras aplicações instaladas

Proteção contra desprendimentos, Estabilização de taludes

O seu contacto local

Ivo Naef
 

Ivo Naef

Sales Manager Safety Solutions

Protecção contra impactos
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Sales Manager Safety Solutions

E-mail