Suíça
Suíça

myGeobrugg

Estabilização de taludes - Northchurch 2023

View westwards towards the tunnel portal

Estabilização de taludes - Northchurch 2023

View of final installation

Estabilização de taludes - Northchurch 2023

View from rope access

 
 

Ano de instalação

2023

Situação inicial

Slopes above a railway tunnel portal in Northchurch, Berkhamsted, had shown signs of instability. As part of the West Coast Main Line, this railway is a critical piece of infrastructure for both passengers and freight trains alike.

Tony Gee & Partners Consulting Engineers acted as the designers for the remediation of the ongoing slope instability, whilst BAM Ritchies were the contractors appointed to install the final solution.

Geologia

Holywell Nodular Chalk Formation and New Pit Chalk Formation

Descrição

The chosen design involved a rock-bolted solution of R-32 hollow bar between 8 - 10 meters long with over 730 rock bolts used across the site, which spanned from above the tunnel portal around to the northern side of the cutting and then eastwards.

TECCO G45/2 was chosen as the right facing to stabilize the superficial instability.
BAM Ritchies used rope access techniques to install erosion control matting first, followed by TECCO G45/2.

Geobrugg worked with Tony Gee & BAM Ritchies to ensure design and installation of the TECCO system was appropriate and simple.

Promotor

Contratante

Objecto protegido

Caminho de ferro, Área residencial

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail