Consolidamento di versanti - Northchurch 2023

View westwards towards the tunnel portal

Consolidamento di versanti - Northchurch 2023

View of final installation

Consolidamento di versanti - Northchurch 2023

View from rope access

 
 

Anno di installazione

2023

Situazione iniziale

Slopes above a railway tunnel portal in Northchurch, Berkhamsted, had shown signs of instability. As part of the West Coast Main Line, this railway is a critical piece of infrastructure for both passengers and freight trains alike.

Tony Gee & Partners Consulting Engineers acted as the designers for the remediation of the ongoing slope instability, whilst BAM Ritchies were the contractors appointed to install the final solution.

Geologia

Holywell Nodular Chalk Formation and New Pit Chalk Formation

Descrizione

The chosen design involved a rock-bolted solution of R-32 hollow bar between 8 - 10 meters long with over 730 rock bolts used across the site, which spanned from above the tunnel portal around to the northern side of the cutting and then eastwards.

TECCO G45/2 was chosen as the right facing to stabilize the superficial instability.
BAM Ritchies used rope access techniques to install erosion control matting first, followed by TECCO G45/2.

Geobrugg worked with Tony Gee & BAM Ritchies to ensure design and installation of the TECCO system was appropriate and simple.

Paese / Regione

Regno Unito

Cliente

Progettazione:

Contraente:

Oggetto protetto

Ferrovia, Zona residenziale

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

René Müller
   

René Müller

Country Manager Western Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Project Manager Sales Eastern Switzerland

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Sistema di monitoraggio da remoto
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Svizzera Country Manager Southern Switzerland

E-mail