スイス
スイス

myGeobrugg

 - Tumbarumba, Snowy Valley Council 2018

Installation completed: the mesh is fixed on the structured rockface with spike plates

 - Tumbarumba, Snowy Valley Council 2018

Parts of the slope are additionally covered with a revegetation system.

 - Tumbarumba, Snowy Valley Council 2018

The bumpy embankment covered with mesh and an erosion control mat.

 - Tumbarumba, Snowy Valley Council 2018

Passive stabilisation on the left side where the nets works as a drape. Active stabilisation on the right side with a «pattern» of spike plates.

 
 

設置年

2018

状況

Failing slope on road cutting. 

説明

Geobrugg provided DELTAX® with P33/40 spike plates for an active system, with TECMAT® where required and also the use of DELTAX for a drape appliction.

顧客名

Snowy Valley Council

保護対象

道路

腐食防止

ジェオブルッグ ウルトラコーティング

エンジニアリング

Specialised Geo Pty Ltd

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム