미국
미국

myGeobrugg

Limestone Stadium Bad Segeberg

비탈면 보강 시스템 - Limestone Stadium Bad Segeberg 2008

SPIDER® System protecting slopes next to spectators' area with minimal visual impact

비탈면 보강 시스템 - Limestone Stadium Bad Segeberg 2008

Installation during the event season required mobile cranes

비탈면 보강 시스템 - Limestone Stadium Bad Segeberg 2008

Drilling works using a crane platform for the installation of the SPIDER® S4-230 net

비탈면 보강 시스템 - Limestone Stadium Bad Segeberg 2008

Rope access works during installation of the mesh

 

Systems

 

설치 년도

2008

Situation

Since 2007, in the Limestone Stadium of Bad Segberg, rock faces were cleared to protect performers and spectators from rockfall.  Unfortunately, this caused considerable damage to the stage and scenery.  There was also a persistent risk that «bulges» over 100 m²  and several meters thick would come loose and crash down without warning.

Geology

The Kalkberg (limestone mountain) is mainly composed of anhydrite. Under the influence of humidity, dew, and rainfall, this turns to gypsum and increases volume. This process, known as gypsification, creates shell-like «bulges» up to several meters thick which protrude from faults running parallel to the slope.

Description

Extensive tests and calculations were carried out before the protective work began. Trial anchors were installed to select the most suitable grouting mortar.

The SPIDER® rock protection system was dimensioned with SPIDER ONLINE-TOOL software by the Technical University Freiberg.

Around the stage, the appearance of the rock face could not be altered.  No nets could be hung in this area.  Rock nails with countersunk heads were used instead.

Installation of the SPIDER® rock protection system took place in 2009 and 2010 on several rock faces (e.g., near the cave exit and above the spectators' area).  In some cases, this occurred while events were in progress, in the theater. The rock face heights are between 20 and 30 meters which posed an additional challenge to the contractor, due to limited accessibility. A mobile crane with an attached drilling platform was used for some of the drilling work.

Customer

Stadt Bad Segeberg

Engineering

Geomontan GmbH, Grossschirma / OT Rothenfurth

Contractor

Stump Spezialtiefbau GmbH, Niederlassung Chemnitz

Subcontractor

Geotechnik Projekt, Dr. Ing. Penzel / Technical University Bergakademie Freiberg

Protected object

Mine / Quarry, Touristic infrastructure, Art

부식방지

GEOBRUGG SUPERCOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi
 

Saleh Feidi

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국

이메일

John Kalejta
 

John Kalejta

자연 재해
유압 공학
Geobrugg North America, LLC,KS 67226 Wichita / 미국

이메일

Bob Lyne
 

Bob Lyne

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

이메일

Tim Shevlin
 

Tim Shevlin

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국

이메일