Dil
Türkçetr
Amerika Birleşik Devletleri
myGeobrugg

Kayıt

Kişisel giriş bilgileriniz var mı?

Kayıtlı bir myGeobrugg kullanıcısı olarak indirilebilir dokümanların ve sunduğumuz boyutlandırma programlarına yönelik erişim imkanınızı genişlettiniz.

Kayıt ol
A company of the BRUGG Group
Amerika Birleşik Devletleri
Limestone Stadium Bad Segeberg 2008 - Geobrugg Limestone Stadium Bad Segeberg 2008 - Geobrugg
Limestone Stadium Bad Segeberg 2008 - Geobrugg Limestone Stadium Bad Segeberg 2008 - Geobrugg
Limestone Stadium Bad Segeberg 2008 - Geobrugg Limestone Stadium Bad Segeberg 2008 - Geobrugg
Limestone Stadium Bad Segeberg 2008 - Geobrugg Limestone Stadium Bad Segeberg 2008 - Geobrugg

Limestone Stadium Bad Segeberg

   Paylaş
Posta Kodu
23795
Yer
Bad Segeberg
Ülke / Bölge
Almanya
Kurulum Yılı
2008
Müşteri
Stadt Bad Segeberg
Mühendislik
Geomontan GmbH, Grossschirma / OT Rothenfurth
Yüklenici
Stump Spezialtiefbau GmbH, Niederlassung Chemnitz
Alt yüklenici
Geotechnik Projekt, Dr. Ing. Penzel / Technical University Bergakademie Freiberg
Gösterilen obje
Quarry / Mine, Touristic infrastructure, Sanat
Sistemler
SPIDER®
Korozyon koruması
GEOBRUGG SUPERCOATING®
Dengelenen alan
2000 m²
Maksimum eğim yüksekliği
30 m
Eğim meyili
60 ° - 90 °
Konumlandırma
-
Kurulan diğer uygulamalar
Madencilik / Tüneller
Jeoloji

The Kalkberg (limestone mountain) is mainly composed of anhydrite. Under the influence of humidity, dew, and rainfall, this turns to gypsum and increases volume. This process, known as gypsification, creates shell-like «bulges» up to several meters thick which protrude from faults running parallel to the slope.

Durum

Since 2007, in the Limestone Stadium of Bad Segberg, rock faces were cleared to protect performers and spectators from rockfall.  Unfortunately, this caused considerable damage to the stage and scenery.  There was also a persistent risk that «bulges» over 100 m²  and several meters thick would come loose and crash down without warning.

Açıklama

Extensive tests and calculations were carried out before the protective work began. Trial anchors were installed to select the most suitable grouting mortar.

The SPIDER® rock protection system was dimensioned with SPIDER ONLINE-TOOL software by the Technical University Freiberg.

Around the stage, the appearance of the rock face could not be altered.  No nets could be hung in this area.  Rock nails with countersunk heads were used instead.

Installation of the SPIDER® rock protection system took place in 2009 and 2010 on several rock faces (e.g., near the cave exit and above the spectators' area).  In some cases, this occurred while events were in progress, in the theater. The rock face heights are between 20 and 30 meters which posed an additional challenge to the contractor, due to limited accessibility. A mobile crane with an attached drilling platform was used for some of the drilling work.

Yerel yetkiliniz

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / USA
Telefon +1 860 377 3230

İletişim formu

Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / USA
Telefon +1 909 706 8964

İletişim formu

John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / USA
Telefon +1 505 220 1404

İletişim formu

Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / USA
Telefon +1 336 337 0945

İletişim formu

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Telefon +1 505 771 4080
Mobil +1 505 400 0796

İletişim formu

Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / USA
Telefon +1 503 423 7258

İletişim formu