Elveţia
Elveţia

myGeobrugg

Limestone Stadium Bad Segeberg

Stabilizarea pantelor - Limestone Stadium Bad Segeberg 2008

SPIDER® System protecting slopes next to spectators' area with minimal visual impact

Stabilizarea pantelor - Limestone Stadium Bad Segeberg 2008

Installation during the event season required mobile cranes

Stabilizarea pantelor - Limestone Stadium Bad Segeberg 2008

Drilling works using a crane platform for the installation of the SPIDER® S4-230 net

Stabilizarea pantelor - Limestone Stadium Bad Segeberg 2008

Rope access works during installation of the mesh

 

Sisteme

 

Anul instalării

2008

Situația inițială

Since 2007, in the Limestone Stadium of Bad Segberg, rock faces were cleared to protect performers and spectators from rockfall.  Unfortunately, this caused considerable damage to the stage and scenery.  There was also a persistent risk that «bulges» over 100 m²  and several meters thick would come loose and crash down without warning.

Geologie

The Kalkberg (limestone mountain) is mainly composed of anhydrite. Under the influence of humidity, dew, and rainfall, this turns to gypsum and increases volume. This process, known as gypsification, creates shell-like «bulges» up to several meters thick which protrude from faults running parallel to the slope.

Descriere

Extensive tests and calculations were carried out before the protective work began. Trial anchors were installed to select the most suitable grouting mortar.

The SPIDER® rock protection system was dimensioned with SPIDER ONLINE-TOOL software by the Technical University Freiberg.

Around the stage, the appearance of the rock face could not be altered.  No nets could be hung in this area.  Rock nails with countersunk heads were used instead.

Installation of the SPIDER® rock protection system took place in 2009 and 2010 on several rock faces (e.g., near the cave exit and above the spectators' area).  In some cases, this occurred while events were in progress, in the theater. The rock face heights are between 20 and 30 meters which posed an additional challenge to the contractor, due to limited accessibility. A mobile crane with an attached drilling platform was used for some of the drilling work.

Client

Stadt Bad Segeberg

Antreprenor

Stump Spezialtiefbau GmbH, Niederlassung Chemnitz

Obiect protejat

Carieră / Mina, infrastructura turistică, Artă

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

Geomontan GmbH, Grossschirma / OT Rothenfurth

Alte companii implicate

Geotechnik Projekt, Dr. Ing. Penzel / Technical University Bergakademie Freiberg

Alte aplicaţii instalate

Minerit / Tuneluri

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail