スイス
スイス

myGeobrugg

 - Kroscienko-Klodno 2018

Impact - the barrier does its job and holds back the falling rocks

 - Kroscienko-Klodno 2018

Situation in 2016 before the installation of the barriers: boulders were coming down frequently and hitting the road.

 - Kroscienko-Klodno 2018

The RXE-500-LA barrier with secondary mesh after installation

 - Kroscienko-Klodno 2018

Protected road and residential area

 - Kroscienko-Klodno 2018

The barriers are 60 and 96 meters long, both 3 meters high

 - Kroscienko-Klodno 2018

Another rockfall incident (winter 2019)

 

システム延長

60 m - 96 m

 

設置年

2018

状況

Regular rockfall menaced the village of Kroscienko. Boulders were falling on an access road adjacent to backyards and homes.

説明

In 2017, the Regional Directorate of State Forests in Krakow decided to secure the endangered area. As the stretch was rather long, they were convinced of the RXE-500-LA barriers with low anchoring forces and quick installation.

顧客名

Soley sp.z o.o.

エンジニアリング

Soley Sp. z o.o.

落札者

Soley Sp. z o.o.

保護対象

道路, 居住区

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム