Olt Valley, km 239+500 - 246+500

落石防护 - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall barrier protecting national road DN7

落石防护 - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall barrier base plate anchors drilling works

落石防护 - Olt Valley, km 239+500 - 246+500 2015

Drilling flexible wire rope anchors for the GBE-1000A barrier

落石防护 - Olt Valley, km 239+500 - 246+500 2015

One of the GBE-1000A rockfall barrier lines, completely installed

落石防护 - Olt Valley, km 239+500 - 246+500 2015

GBE-1000A rockfall without border post - special solution for direct rock face connection

落石防护 - Olt Valley, km 239+500 - 246+500 2015

Perfect solution containing passive GBE-1000A rockfall barrier and active slope stabilization with nailed TECCO® SYSTEM³

落石防护 - Olt Valley, km 239+500 - 246+500 2015

Another line of GBE-1000A barrier with direct rock face connection

落石防护 - Olt Valley, km 239+500 - 246+500 2015

Fully installed VX-060L debris flow barrier

落石防护 - Olt Valley, km 239+500 - 246+500 2015

A short - only 22 m long - GBE-1000A barrier along national road DN7

 
 

系统长度

20 m - 50 m

 

安装年份

2015

情况

National road no. 7 (DN7) is one of the most important routes through the Carpathian Mountains, with heavy traffic. The Olt River runs parallel to the DN7 with high mountains, directly next to the road. In winter and spring rockfalls occur regularly. Also with unstable slopes, torrents and avalanches the risk of accidents was high. 

This project was originally developed with five concrete canopies for rockfall protection. Due to costs and other restrictions, a modern solution using high tensile steel wire was chosen. After further investigation, 23 dangerous areas were found and had to be protected using two types of protection systems: active and passive.

描述

GBE rockfall barriers were provided as a passive protection at the following sectors:

1. km 240+454 - 240+510

GBE-1000

  • capacity: 1000 kJ
  • height: 5 m
  • length: 56 m

2. km 240+555 - 240+577

GBE-1000

  • capacity: 1000 kJ
  • height: 3 m
  • length: 22 m

3. km 242+453 - 242+457 (as a debrisflow barrier)

VX-060

  • height: 3 m
  • length: 8 m

 4. km 242+457 - 242+610

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m and 36 m

 5. km 242+859 - 242+940

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

 

6. km 243+099 - 243+179

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

See also the other projects of Olt Valley.

客户

Compania Naţională de Administrare a Infrastructurii Rutiere (C.N.A.I.R.) – Directia Regionala de Drumuri si Poduri Craiova (D.R.D.P.)

承包商

S.C. VECTRA GROUP S.A.

防护对象

Road

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

工程

A.C. IRIMAT Cons S.R.L.

分包商

Sachschische Bau GmbH Dresden Germany, Sibiu Branch

其他安装的应用程序

边坡稳定, 泥石流和滑坡防护

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址