瑞士
瑞士

myGeobrugg

落石防护 - Kroscienko-Klodno 2018

Impact - the barrier does its job and holds back the falling rocks

落石防护 - Kroscienko-Klodno 2018

Situation in 2016 before the installation of the barriers: boulders were coming down frequently and hitting the road.

落石防护 - Kroscienko-Klodno 2018

The RXE-500-LA barrier with secondary mesh after installation

落石防护 - Kroscienko-Klodno 2018

Protected road and residential area

落石防护 - Kroscienko-Klodno 2018

The barriers are 60 and 96 meters long, both 3 meters high

落石防护 - Kroscienko-Klodno 2018

Another rockfall incident (winter 2019)

 

系统长度

60 m - 96 m

 

安装年份

2018

情况

Regular rockfall menaced the village of Kroscienko. Boulders were falling on an access road adjacent to backyards and homes.

描述

In 2017, the Regional Directorate of State Forests in Krakow decided to secure the endangered area. As the stretch was rather long, they were convinced of the RXE-500-LA barriers with low anchoring forces and quick installation.

客户

Soley sp.z o.o.

承包商

Soley Sp. z o.o.

防护对象

Road, Residential area

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Soley Sp. z o.o.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址