Delimitarea drumurilor - Bodenberg B21 2020

Fully installed system, protection for both parties

Delimitarea drumurilor - Bodenberg B21 2020

Installation of NORDBETON concrete barriers with reflectors

Delimitarea drumurilor - Bodenberg B21 2020

Panels arriving in panel rack; note the NORDBETON transition end element for road safety

Delimitarea drumurilor - Bodenberg B21 2020

Use of crane to install panels

Delimitarea drumurilor - Bodenberg B21 2020

Originally developed for motorsports, installed with accordance to FIA 3502-2018

Delimitarea drumurilor - Bodenberg B21 2020

Completely installed, mobile, temporary rockfall protection fence

Delimitarea drumurilor - Bodenberg B21 2020

Roadfence as a temporary rockfall protection

 

Lungime sistem

60 m

 

Anul instalării

2020

Situația inițială

Scaling activities must take place at Bodenberg B21. In order to keep the road open, the road authorities had to select a system that protects both traffic from the falling rock and the road workers from the traffic. They required that the system is robust and quickly deployable.

Descriere

The solution: 60 meters of homologated mobile debris fence (mDF350-2) while keeping one lane of the road open within two weeks of order. The installation took 4 hours to complete. It allows for the road to remain open during the entire works.

Antreprenor

Obiect protejat

Road, Infrastructură, Altele

Alte aplicaţii instalate

Protecţia împotriva căderilor de pietre

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail