スイス
スイス

myGeobrugg

Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

TECCO® SYSTEM³ after installation - slope is fully protected

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Overview of the construction site

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Slope cut at km 147+020 showing the geology conditions of the construction site

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Extremely weathered ground conditions at km 147+780 before stabilization works

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Installation works in progress at km 147+780 - slope is already particularly stabilized with TECCO® SYSTEM³

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Installation and drilling works in progress, at the slope angle of 75°

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Laying of TECCO® G65/3 mesh under the supervision of Geobrugg specialist

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Slope covered with TECCO® G65/3 mesh along with MultiMat 030 to support further vegetation

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Closer look at the slope completely stabilized with TECCO® SYSTEM³ - visible mesh pretensioning effect, minimizing further deformations

 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

TECCO® G65/3 mesh together with anti-erosion Tenax Multimat 030 after installation completion

 

システム

 

設置年

2015

状況

A total of 8 different chainage locations with a cumulative area of approximately 50000 m² of slopes required stabilization. The client required an active slope stabilization system with greening which should look aesthetically appealing. This project is a part of the project 4-Laning of Kiratpur-NerChowk section of National Highway-21 (from km 21.55 to km 154.00) in the state of Punjab & Himachal Pradesh.

説明

TECCO® SYSTEM³ was nailed by fully threaded rock-bolts, with minimum dia of 28 mm to a maximum of 40 mm and hot-dip galvanized. The nail pattern was variable with 1.9 x 1.9 m to a maximum of 2.4 x 2.4 m at different chainage points. The installation was carried out by trained professionals having expertise in drilling and civil work, under the expert supervision of Geobrugg India Pvt. Ltd. to ensure maximum safety with correct methodology also guiding the site engineers and sub-contractors for optimum effects and results.

顧客名

IL&FS Engineering & Construction Company Ltd.

落札者

M/s Pioneer Foundations Engineers, M/s Sai Gr Impex Pvt. Ltd., M/s Afond Construction Pvt. Ltd.

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

ITNL & Grusamar Ltd.

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム