myGeobrugg
2018
In the residential area of San Nicolas, superficial problems of instability occurred in 2017. The real estate developer of the project asked for a solution to protect the back yards of some houses, which were already inhabited.
Lime soil layer.
A superficial stabilization with TECCO® G65/3, erosion control mat and nails between 3 to 6 meters was installed.
Portales de Nuevo Emperador S.A.
NDC
Zone résidentielle
GEOBRUGG SUPERCOATING
Eng. José Harris