USA
USA

myGeobrugg

Stabilizacja skarp - Wellards Way 2021

The slope following installation

Stabilizacja skarp - Wellards Way 2021

Site visit 20th October 2020

Stabilizacja skarp - Wellards Way 2021

Site visit 19th October 2021 with revegation

 
 

Rok Instalacji / Montazu

2021

Sytuacja początkowa

Due to recent bad weather, there became a hazard of chalk blocks coming loose from the slope above and falling onto the zig-zagging footpath below. The footpath provides the only point of access for crossing the existing railway (directly south) to Shakespeare Beach, and it was key that the route was made safe for public use.

Geologia

New Pit Chalk Formation - a chalk of the Cretaceous Period.

Opis zastosowanego rozwiazania

Following a visit to the site in October 2020, we worked with the contractor, South East Abseiling, to find an appropriate solution for the problem. Due to the site’s proximity to the sea, a stainless steel mesh was recommended to ensure the highest degree of corrosion protection.

We supplied TECCO STAINLESS G65/3 and TECMAT and stainless steel P33/40 spike plates to ensure stablisation and revegetation of the existing slope. We maintained close contact with the contractor during the works, always on hand to answer technical queries related to installation and performance of our system. In particular, we advised the appropriate method of installation for TECMAT beneath TECCO STAINLESS G65/3 to ensure there was no contamination and subsequent degradation of the corrosion protection provided by the stainless steel mesh.
The result was a tidy installation and successful slope stablisation. A follow-up site visit was undertaken in October 2021, showing beginning revegetation.

Kraj / Region

Zjednoczone Królestwo

Inwestor

Chroniony Objekt

Railway, Touristic infrastructure

Ochrona przeciwerozyjna

INOX / STAINLESS

Osoba kontaktowa na miejscu

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA Regional Manager California

Formularz kontaktowy

Bryant Jackson
 

Bryant Jackson

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / USA

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

Formularz kontaktowy

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Zagrożeniami naturalnymi
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / USA Regional Sales Manager Pacific Northwest and Hawaii

Formularz kontaktowy