Ochrona przed lawinami - Sørøya I 2019

SPIDER® Avalanche protecting the main road of Soroya from Hasvik to Sørvær from avalanches and rockfall

Ochrona przed lawinami - Sørøya I 2019

The low weight components enable the transport by helicopter

Ochrona przed lawinami - Sørøya I 2019

The systems are installed close to the shore line

Ochrona przed lawinami - Sørøya I 2019

Nearly 1500 meters of SPIDER® Avalanche protect the main road from avalanches and rockfalls

Ochrona przed lawinami - Sørøya I 2019

View on nearly all of the installed systems

Ochrona przed lawinami - Sørøya I 2019

The netting provides a flexible protective surface which is barely visible from a distance

Ochrona przed lawinami - Sørøya I 2019

The posts are erected on anchorless pressure plates, which saves time and is particularly advantageous on creeping slopes

 
 

Dlugosc systemu od

8 m - 82 m

 

Rok Instalacji / Montazu

2019

Sytuacja początkowa

On the Norwegian island Sørøya, the main road from Hasvik to Sørvær was threatened by rockfall in the summertime and avalanches during the winter. The road construction authorities decided to undertake sustainable measures to mitigate these hazards for this important road. As the starting zone of the avalanche is situated approximately 200 meters above the route, the installation of the protection system had to be carried out by helicopter.

At this site GUARD monitoring devices are installed as well, read about this installation from 2020.

Opis zastosowanego rozwiazania

The construction company DS Entreprenør AS was commissioned by the Norwegian road construction authorities to evaluate possible solutions. Fjerby decided to install approximately 1400 meters (Dk 3.5) of the Geobrugg SPIDER® Avalanche system. This solution provides rockfall protection with energies up to 500 kJ in the summer as well as avalanche prevention in winter. SPIDER® Avalanche is also hardly visible, which is especially fundamental in the untouched nature of the island Sørøya.

Video of the installation: https://youtu.be/KDb0JmXEbYU

Kraj / Region

Norwegia

Wykonawca

Chroniony Objekt

Road, Touristic infrastructure, Infrastructure

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Western Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Western Switzerland

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Formularz kontaktowy

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria , Msc. Env. Eng.

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria Country Manager Southern Switzerland

Formularz kontaktowy