Stabilizacja skarp - Sendall Tunnel 2016

TECCO® G65/3 high tensile steel mesh serving as passive protection (drape) - view from under the slope - the mesh is nearly invisible

Stabilizacja skarp - Sendall Tunnel 2016

The area where the Ameritec specialists installed the drapery mesh to stabilize the rocks

Stabilizacja skarp - Sendall Tunnel 2016

The retaining wall built to support the Presbyterian Church located just above the historic Sendall Tunnel

Stabilizacja skarp - Sendall Tunnel 2016

Closer look on the slope covered with drape made out of high tensile steel TECCO® G65/3 mesh

Stabilizacja skarp - Sendall Tunnel 2016

View from the top of the slope towards Sendall Tunnel entrance

Stabilizacja skarp - Sendall Tunnel 2016

View from the top of the secure slope on the tourist port of St. George

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2016

Sytuacja początkowa

The slope at the western portal of the Sendall tunnel was affected by rockfall events, which represented a high risk for pedestrians and motorists travelling daily in the touristy port area of St. George. At the top of the embankment there is also a Presbyterian church from the XIXth century, which has been restored for its historical and touristical significance.

Geologia

Colluvium soil of sand soil with rock blocks.

Opis zastosowanego rozwiazania

The designer decided to install high tensile TECCO® G65/3 mesh as a drape due to it's unique features, low maintenance requirements and corrosion protection.

As a direction protection of the Presbyterian Church, ca. 20 meters long retaining wall was constructed just below, along its western boundry.

Kraj / Region

Grenada

Inwestor

Goverment of Grenada / World Bank

Projektant

Glean´s Construction and Engineering Co. Ltd.

Wykonawca

Jiangsu Geology & Engineering Co. Caribbean Ltd.

Inne przedsiębiorstwa

Ameritech Slope Constructors Inc.

Chroniony Objekt

Road, Touristic infrastructure

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Western Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Western Switzerland

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria Country Manager Southern Switzerland

Formularz kontaktowy