Stabilizacja skarp - Selo Boyolali 2016

The TECCO® high tensile steel wire mesh stabilizes the steep Lahar slope. Vegetation is already covering the steep hill. The anchored concrete beam at the top absorbs the traffic load and acts as a stiffening element.

Stabilizacja skarp - Selo Boyolali 2016

Rolling down the TECMAT® erosion control and the TECCO® high tensile steel wire net. Diamond shaped spike plates attach the net. Due to the optimized nail pattern, this took only a couple of days.

Stabilizacja skarp - Selo Boyolali 2016

The completed TECCO® slope stabilization. It took the team only four months - congratulations!

Stabilizacja skarp - Selo Boyolali 2016

Frontal view onto the impressive bamboo scaffold: traditional methods meeting newest technologies

Stabilizacja skarp - Selo Boyolali 2016

The entirely green, completely revegetated slope in 2020

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2016

Sytuacja początkowa

Jembatan Samiran road lies approximately 35 kilometers west from Surakarta. The road widening project that connects Magelang and Boyolali cuts travel time and helps to spur economic growth in the area. In the past, the operation got constraint massively by the occurrence of large slope failure, in which one road lane slipped down to the creek. The site is troublesome due to its steepness and geological condition, due to the intense rainy season and frequent earthquakes.

The road engineers decided on a new effective solution, tested and withstanding the harshness of the site, actively and permanently stabilizing the problematic embankment. Quickly and safely installed in respect of the challenging accessibility. Moreover, blending in with nature: TECCO® System.

TECCO® System is a permanent and active slope stabilization system made of high tensile steel wire mesh in combination with soil nailing or rock bolting.

Geologia

Lahar

Opis zastosowanego rozwiazania

After the stakeout in collaboration with local experts and Geobrugg engineers, five hardworking drilling team completed drilling works in less than four months. Given the demanding weather conditions, this is an astonishing performance.

2'500 sqm of slope stabilization with TECCO® System mesh and hydroseeding were completed within two weeks.


Green Rehabilitator, the expert in landscape & erosion control services from Semarang, executed the hydroseeding.

Inwestor

Bina Marga

Chroniony Objekt

Road, Touristic infrastructure

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Inne przedsiębiorstwa

PT. Amavi

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy