Milibach Torrent, Hasliberg, Canton of Bern

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Filled barrier after the impact - view from downstream

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Satellite image of the storm that moved across the northern Swiss Alps on October 10 (source: SF Meteo website)

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Filled barrier after the impact

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Filled barrier after the impact

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Partially engaged UX-barrier - ready for more

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Event mapping

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Erosion and slope instability

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Staking

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Drilling with a specially equipped excavator

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Installing flexheads

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Foundation with installed flexheads

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Ring net ready to be placed

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Connecting the ring net to the ropes

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Final assembly of the components

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi  osuwiskami - Milibach Torrent, Hasliberg, Canton of Bern 2011

Anchor test

 

Zastosowane systemy

 

Dlugosc systemu od

500 m - 7 m

 

Rok Instalacji / Montazu

2011

Sytuacja początkowa

In August 2005, a storm in the Weiler Reuti and in Meiringen had caused serious debris coverage and severe damage. To protect the two settlements, a cascade comprised of 13 flexible debris flow barriers was installed to retain a cumulative volume of up to 10,000 m³ was installed.

On October 10, 2011, heavy rainfall triggered a shallow landslide containing a total of 2,000 m³ of schist in the drainage area of the Milibach river. Approximately 80 mm of rain had fallen onto a 70 cm layer of existing snow in 12 hours. The Swiss Federal Office for Environment (FOEN) categorized these heavy rainfalls as the 100-year event.

Opis zastosowanego rozwiazania

This multilevel debris flow barrier system successfully retained an estimate 2,000 m³ of debris from the October 2011 100-year event before the slide had any opportunity to gain momentum and cause significant damage, as had happened in 2005. The event filled barrier no. 2 completely and barrier no. 5 partially. Barrier 1, which was situated above where the shallow landslide was triggered, remained unaffected, while barriers 3 and 4 were not filled as they have a higher basal opening.

Stopping the 2,000 m³ of debris helped prevent further erosion along the unstable banks of the Milibach River and dissipated an event that could have caused damage to the settlements further downstream. After an in-depth investigation during an on-site inspection, the customer decided to leave barrier no. 2 filled to protect the riverbanks. The debris held by barrier no. 5 is also being left and should be carried away over time as the water drains naturally.

Inwestor

.

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Inne zainstalowane aplikacje

Ochrona przed spływami gruzowymi (rumowisko) i płytkimi osuwiskami

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy