Meckenbeuren dam protection against badger

Chronić wybrzeża morskiego - Meckenbeuren dam protection against badger 2022

Railway dam protected against badgers and other borrowing animals.

Chronić wybrzeża morskiego - Meckenbeuren dam protection against badger 2022

Badger den entrance before the measures. The den entrance is below the railway and has a diameter of around 30 cm.

Chronić wybrzeża morskiego - Meckenbeuren dam protection against badger 2022

Installation of the mesh. Not visible in the picture: In a final step, the mesh was laid in the previously excavated trench, anchored in the ground and then covered over.

Chronić wybrzeża morskiego - Meckenbeuren dam protection against badger 2022

Fixation of the mesh with soil nails and ground anchors

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2022

Sytuacja początkowa

At the railway embankment (DB line 4500, Meckenbeuren - Kehlen, railway km 189.5+45 to km 190.1+15), measures against badger infestation and the resulting undermining and subsidence had become necessary. In the past, the tracks had already been displaced due to undermining caused by the burrowing of badgers in the railway dam.

Both sides of the embankment had to be protected from future damages.

Opis zastosowanego rozwiazania

After the existing badgers had been deterred, Geobrugg provided 11´500 m² of TECCO G45/2 to protect the railway against badgers and other borrowing animals. To make sure no badger was trapped inside their den, the mesh was first cut out at the den entrances to ensure the getaway. These openings were provided with a flap to prevent animals from getting back inside the dam. After a few months, the dens were filled with soil and sealed with the TECCO mesh. 

Inwestor

DB Netz AG

Wykonawca

Chroniony Objekt

Railway

Inne zainstalowane aplikacje

Stabilizacja skarp

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy