The Alto Maipo project consists of a hydroelectric plant which includes five high mountain intakes, 70 kilometers of tunnels at an average depth of 800 meters, two cavern power plants - Alfalfal II and Las Lajas- with a combined capacity of 531 MW and 17 kilometers of high voltage lines.

The relevant civil works consider 70 kilometers of tunnels excavated in solid rock, at an average depth of 800 meters. Its size is defined by the flow rate to be transported and the minimum dimensions required for the operation of the excavation machinery. The tunnels will conduct the water under pressure and at low speed, losing very little energy until it reaches the machine caverns.

Due to the mountain range area rock bursting problems have been registered. The require fortification in order to protect both human lives and the machinery necessary for the development of a tunnel.

Opis zastosowanego rozwiazania

For safety reasons MINAX® 80/4  rock mesh have been implemented: In order to provide the necessary energy absorption capacity in case of rock bursting that could occur due to the geological conditions of the tunnels of the Alto Maipo project.

At the same time, in order to optimize the fortification operation and safeguard the integrity of the workers, the MESHA® device has been implemented. The nailing is carried out fully mechanized.

Kraj / Region

Chile

Inwestor

AES GENER

Chroniony Objekt

Mine / Quarry, Other

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

René Müller
   

René Müller

Country Manager Western Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Western Switzerland

Formularz kontaktowy

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Szwajcaria Country Manager Southern Switzerland

Formularz kontaktowy