Kopalnie / Wydobycie / Tunel - Hydroelectric Power Plant Tunnel 2014

Mechanized installation process with MESHA® on Sandvik equipment

Kopalnie / Wydobycie / Tunel - Hydroelectric Power Plant Tunnel 2014

MINAX® 80/4 installed with standard plates. Thanks to knotted mesh ends, rockbolts installed in the last opening are not problematic.

Kopalnie / Wydobycie / Tunel - Hydroelectric Power Plant Tunnel 2014

Rockburst problem during constrution of the headrace tunnel - it is clear the the ground support structure had to be reinforced

Kopalnie / Wydobycie / Tunel - Hydroelectric Power Plant Tunnel 2014

Mechanized installation process with the MESHA® handler

Kopalnie / Wydobycie / Tunel - Hydroelectric Power Plant Tunnel 2014

Jumbo equipped with MESHA® handler on the way to the tunnel front

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2014

Sytuacja początkowa

During construction of the headrace tunnel in July 2012 for a hydro power plant some severe rockburst occured. The high internal stress in the rock and overburden over 1000 m on top of the tunnel as well as the brittle metamophic character with a rock mass rating RMR › 65 caused some severe problems during the project.

Opis zastosowanego rozwiazania

The tunnel was divided in sectors to analyse the stress level in regard to the high stress classification whereas it shows that some rockbursts of level 2 and 3 occured. In the most critical zone a support system with MINAX® 80/4 was applied in combination with mechanized installation thanks to Geobrugg's MESHA® handler. The installation time had been decreased between 20 to 25% and safety for workes was significantly improved.

Inwestor

-

Chroniony Objekt

Other

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy