USA
USA

myGeobrugg

Stabilizacja skarp - Exit portal Railway Tunel Biobío 2022

Front view of the Exit Portal

Stabilizacja skarp - Exit portal Railway Tunel Biobío 2022

Setting out anchors

Stabilizacja skarp - Exit portal Railway Tunel Biobío 2022

Drilling process

Stabilizacja skarp - Exit portal Railway Tunel Biobío 2022

Top view of the portal

Stabilizacja skarp - Exit portal Railway Tunel Biobío 2022

View of the portal and the railway bridge under construction

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2022

Sytuacja początkowa

The new Biobío railway bridge project in the city of Concepción included a new railway line with a tunnel through Chepe Hill. The portals of this tunnel had to be reinforced. The system designed for this reinforcement was shotcrete and 9 meters long anchor bolts.

Geologia

Weathered granitic rocks of the coastal batholith (maicillo)

Opis zastosowanego rozwiazania

Geobrugg was approached for a solution that reduces the intervention's visual impact and the reinforcement's carbon footprint. With these requirements in mind, Geobrugg proposed replacing the shotcrete with TECCO GREEN mesh, which has a lower carbon footprint and allows the portals to be revegetated.

Inwestor

Wykonawca

Chroniony Objekt

Railway

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

Formularz kontaktowy

John Kalejta
 

John Kalejta

Regional Manager Central US

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Sales Director

Zagrożeniami naturalnymi
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

Formularz kontaktowy