USA
USA

myGeobrugg

Kopalnie / Wydobycie / Tunel - Alrosa Diamond Mine, Aykhal 2018

The rockface including the portal, which is protected with the TECCO® mesh.

Kopalnie / Wydobycie / Tunel - Alrosa Diamond Mine, Aykhal 2018

Drilling works at the rock wall. Picture © ALROSA.

Kopalnie / Wydobycie / Tunel - Alrosa Diamond Mine, Aykhal 2018

View on to the upper part oft the installation.

Kopalnie / Wydobycie / Tunel - Alrosa Diamond Mine, Aykhal 2018

After drilling and inserting the anchors, the mesh can simply be unrolled and fixed with spike plates.

 
 

Rok Instalacji / Montazu

2018

Sytuacja początkowa

The open pit mine is located in Aykhal, Siberia as part of the Aykhal production site - one of the world-leading diamond producing companies ALROSA. Aykhal is situated in the permafrost region – that is why operations in the open pit area are impossible during 2-3 months of the short summer time: Many rockfalls occur as a result of melting permafrost slopes. However an underground mine is operating and trucks are permanently using the portal to the quarry.

Some conventional wire mesh was widely used at this spot until now to safeguard the portal. As this mesh did not provide enough safety and has to be changed every 2-3 years. Alrosa decided to test Geobrugg state-of-the art technology.

Opis zastosowanego rozwiazania

One of the challenges was the delivery of material and drilling machinery to the site: In winter time you may use the ice road which runs along the river Lena.

In the summer material has to be delivered by ship, what takes 1.5 months from the European part of Russia to this site. In the end the installation had to be carried out during the short period when the temperatures were above freezing which is from mid of May to mid of September.

For the protection solution TITAN 40/16 nails with TECCO G65/3 mesh and P33/50 spike plates were used. In total 1400 m2 were stabilized. The pure installation time without delivery times was one month.  

The berms are subject to heavy erosion due to the melting permafrost. TECCO G65/3 then will stabilize actively the berms of the open pit mine in future.

Inwestor

ALROSA

Chroniony Objekt

Mine / Quarry

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Osoba kontaktowa na miejscu

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA Regional Manager Northeast

Formularz kontaktowy

Saleh Feidi
 

Saleh Feidi

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

Formularz kontaktowy

John Kalejta
 

John Kalejta

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,KS 67226 Wichita / USA

Formularz kontaktowy

Bob Lyne
 

Bob Lyne

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / USA

Formularz kontaktowy

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Zagrożeniami naturalnymi
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Formularz kontaktowy

Tim Shevlin
 

Tim Shevlin

Zagrożeniami naturalnymi
Geobrugg North America, LLC,OR 97302 Salem / USA

Formularz kontaktowy