スイス
スイス

myGeobrugg

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

3 200 meters of wire rope and a net hold the rock at risk of demolition, picture RhB

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

Threatened rockfall gallery; picture Vetsch Klosters AG

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

The marked area was unstable and had to be dynamited without damaging the railroad gallery below, picture Caprez Ingenieure

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

Installation of the wire ropes, the railway line lies below, along the "young" river Rhine , picture via RhB

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

Mesh and wire ropes are installed and hold the endangered boulder before blasting, picture via Martina Sättele

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

Wire ropes leading to the meadow above the boulder, picture Vetsch Klosters

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

Secured boulder from above, picture via Martina Sättele

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

Technically and physically demanding work, here the installation of the GUARD monitoring device

GUARD・モニタリングサービス - Valendas: Securing a large block 2022

Geobrugg GUARDs monitored rock movements alongside other systems

 
 

設置年

2022

状況

The railroad line between Reichenau-Tamins and Ilanz runs through a unique landscape. Here, the Rhaetian Railway passes through the Rhine Gorge (Ruinaulta) over a length of about 15 kilometers. Galleries, dams and nets protect the railroad line from falling stones and boulders that break loose from the steep erosion slopes, which can be up to 120 meters high.

In the summer of 2022, a team member of the Surselva railroad service discovered huge stones on the gallery and the slope while inspecting the protective structures. A geologic evaluation revealed that a large boulder was in danger of falling and had to be removed as quickly as possible.

The Rhaetian Railway (RhB) reacted quickly: after the rope inspection by geologists, contractors and project engineers, measures were planned using a 3-D model to determine the volume, position, behavior and center of gravity of the boulder.

 

説明

In a short time, the block weighing almost 500 tons was stabilized with 32 wire ropes (22 mm GEOBINEX). These ropes were firmly anchored on the grassland above with 350 meters of spiral rope anchors (22.5 mm). A heavy-duty net (SPIDER S4-130) measuring over 300 square meters additionally secured the boulder. These measures were designed to prevent the boulder from falling during the blasting operations. Furthermore, several Geobrugg GUARDS continuously monitored the rope loads.

The project was carried out in the shortest possible time and in the best possible cooperation with the client RhB and all those involved so that the safety of everyone involved was guaranteed at all times. Swiss television SRF reported in December 2022.

Involved partner companies of the Rhaetian Railway

国名

スイス

保護対象

鉄道

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム