SPIDER® S3-130 protecting the railway line between Martigny, Switzerland, and Chamonix, France, together with the road to Finhaut, providing a perfect big block stabilization

 - Tunnel de Revenez 2016

Portal of the Tunnel de Revenez - on the left a big amount of scree removed from the railway line

 - Tunnel de Revenez 2016

The site before installation with its steep rock slope directly next to the railway line

 - Tunnel de Revenez 2016

Situation before the stabilization with SPIDER® S3-130 - large loose blocks are endangering the infrastructure below

 - Tunnel de Revenez 2016

Overview before protection measures were implemented

 - Tunnel de Revenez 2016

High tensile SPIDER® S3-130 net was unrolled on the slope before drilling works began. Thus during the top-down drilling the safety of the construction crew was ensured

 - Tunnel de Revenez 2016

To provide optimal blocks stabilization and SPIDER® S3-130 net pre-tensioning, GEWI 32 nails were installed in the dells - where possible

 - Tunnel de Revenez 2016

Detail of the slope stabilization SPIDER® S3-130 net fixed with GEWI 32 nails, border rope and system spike plate P33/40

 - Tunnel de Revenez 2016

At the crest above the stabilized slope, an extra RXE-500 rockfall barrier line was installed to provide extra protection against rockfalls from upper areas

 - Tunnel de Revenez 2016

The RXE-500 rockfall barrier installed directly above the stabilized slope

 - Tunnel de Revenez 2016

SPIDER® S3-130 protecting the railway line and the road, providing perfect stabilzation of the large blocks

 

システム

 

設置年

2016

状況

Directly next to the Tunnel de Revenez is a very steep slope made of large, loose rock blocks which endangered the railway line lying directly below.

地質

Gneiss

説明

To protect the railway line, Martigny-Châtelard and the road lying next to it, 650 m² of SPIDER® S3-130 was installed.  Also installed, was a 3 m high, 24 m long, RXE-500 rockfall barrier.

顧客名

Commune de Finhaut

落札者

ABA Bautec AG

保護対象

道路, 鉄道

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Silvaplus SA

その他設置済み工法

落石対策工

担当者の連絡先

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / アメリカ合衆国 Regional Manager Northeast

お問い合わせフォーム

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / アメリカ合衆国 Regional Manager California

お問い合わせフォーム

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / アメリカ合衆国 Regional Manager Central US

お問い合わせフォーム

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / アメリカ合衆国 Regional Manager Southeast

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / アメリカ合衆国 Sales Director

お問い合わせフォーム