スイス
スイス

myGeobrugg

 - Túneles de Artxanda 2019

Mesh roll-out for an easy installation process

 - Túneles de Artxanda 2019

Covering the steep slope with stabilizing mesh

 - Túneles de Artxanda 2019

The mesh is lightweight and after installation, barely visible

 

システム

 

設置年

2019

状況

The Artxanda Tunnels connect the Txorierri Highway Corridor with Bilbao. In the vicinity of the tunnel entrance, several massive rocks broke. Rocks have fallen onto the roadway, thus endangering traffic. For this reason, Interbiak decided to stabilize this area.

説明

To stabilize the slopes, anchored concrete bars, and a flexible stabilization system were installed. The DELTAX® 80/3 mesh was anchored to the ground with bolts 25 mm in diameter and 6 m long, in a 3Vx4H m² grid.

顧客名

Interbiak, Diputación Foral de Vizcaya

落札者

New Construction, S.L.

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム