アメリカ合衆国
アメリカ合衆国

myGeobrugg

Tidong-I Hydro Electric Project, Himachal Pradesh

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

GBE 2000A rockfall barrier

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

The location

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Installation of QUAROX® Rolled Cable Net at the power house

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Drilling work at the power house

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

QUAROX® RCN during installation at the surge shaft

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Construction works at the surge shaft

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Erection work of GBE-2000A rockfall barrier

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

GBE-2000A Rockfall Barrier

 - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Snowfall after installation of QUAROX®. The solution is not interfering with the natural beauty of this place

状況

The project is located in the Himachal Pradesh state of India and almost 40 km to the east of Kalpa. The power house below a cut and natural slope needed protection against rock falls. Similar to the power house the surge shaft cut also required to be supported by rockfall barrier and rock fall net.

Geology:  The project area lies in Mehbar and Maldi gneisses comprised of kyanite and psamatic gneisses with bands of schist and quartzite. These are intruded by basic and acidic rocks. Some of the rocks are well folliated. The general trends are North-South with moderate trend towards East. These are transacted by number of joints of which the folliation and strike joints are most predominantly followed in frequency by steeply dipping transverse joints.

説明

GBE-2000A of length 50 meters and GBE-1000A of length 30 meters were installed.

The authorities also decided to install flexible slope stabilization system QUAROX® rolled cable net, with GEOBRUGG SUPERCOATING and high-tensile rockfall protection netting DELTAX® G80/2 (Secondary mesh)

Area: 13500 sq.m. Variable grid pattern and fully grouted rock bolts of diameter 32 mm / length 3 m, fully threaded with top 6" galvanized material, Grade EN8, Ft = 500 N/mm².

顧客名

Statkraft

落札者

Pioneer Foundation Engineers Pvt. Ltd.

保護対象

道路, インフラ, その他

腐食防止

ジェオブルッグ スーパーコーティング

その他設置済み工法

斜面・法面対策工

担当者の連絡先

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / アメリカ合衆国 Regional Manager Northeast

お問い合わせフォーム

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / アメリカ合衆国 Regional Manager California

お問い合わせフォーム

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / アメリカ合衆国 Regional Manager Central US

お問い合わせフォーム

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / アメリカ合衆国 Regional Manager Southeast

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / アメリカ合衆国 Sales Director

お問い合わせフォーム