スイス
スイス

myGeobrugg

 - Sylmar Highway 14 and 5 Interchange 2021

The stabilized embankment at the Highway 14 and 5 interchange north of Los Angeles

 - Sylmar Highway 14 and 5 Interchange 2021

Stabilized slope at the interchange from the distance (darker triangle)

 - Sylmar Highway 14 and 5 Interchange 2021

Stabilized part of the slope

 - Sylmar Highway 14 and 5 Interchange 2021

Slope with mesh and spike plates, view from the highway

 - Sylmar Highway 14 and 5 Interchange 2021

After the wildfires, stabilizing the slope at the highway intersection had become necessary

 

システム

 

設置年

2021

状況

Slope needed to be graded and stablized after wildfire hit the Sylmar CA region. 

説明

We provided TECCO G65/3 for an anchored TECCO SYSTEM installation.

顧客名

Baltazar Construction

落札者

Baltazar Construction

保護対象

道路, インフラ

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Caltrans

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム