 - Shis - Khor Fakkan road 2019

Most demanding system test: A few weeks after installation, a debris flow hit the barrier. A sound design, combined with excellent installation works, stopped the debris and prevented the damage.

 - Shis - Khor Fakkan road 2019

Stakeout of the ring net barrier layout: Critical step prior to drilling works to ensure the best performance of the system

 - Shis - Khor Fakkan road 2019

Drilling of the lateral spiral wire rope anchors: Different drilling rigs can be used, depending on the prevailing geology, location, and available machines

 - Shis - Khor Fakkan road 2019

Depending on the length of the lateral spiral wire rope anchors, different tools are used

 - Shis - Khor Fakkan road 2019

As an alternative to stabilizing mesh, a lateral shotcrete layer prevents erosion. The flexible riverbed (V)X barrier was installed within only a couple of days. Great work by Gulf Rock Engineering!

 - Shis - Khor Fakkan road 2019

Rockfall barrier GBE-1000A protecting a tunnel portal at Shis - Khor Fakkan road

 

システム

 

システム延長

6 m - 15 m

 

設置年

2019

状況

The scenic new mountain highway westwards from Khor Fakkan is crossing several Wadis (valleys). Despite the rather arid climate, heavy annual rainfalls are likely to cause debris flows and land- or mudslides along the Wadis.

A solution was necessary to prevent debris flows from blocking the drainage culverts and, even worse, overflow the newly constructed highway.

 

説明

Two 6 meters high VX flexible debris flow barriers

The debris flow barriers were designed using the DEBFLOW online tool in close collaboration with the clients engineering team. The expected impact loads (kN/m²) were calculated based on geology, topography, and other decisive boundary conditions.

In Mai 2019, one of the flexible debris flow barriers underwent the most severe proof: Heavy rainfall triggered several debris flows along the various Wadi's. One of them hit the recently completed barrier which remained undamaged. After an excavator had removed the debris material, the barrier was ready again for the next thunderstorms.

顧客名

Gulf Rock Engineering

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

その他設置済み工法

落石対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム