 - Schwäbisch Gmünd 2015

Overview of the stabilized slope with area for future building foundation in the back

 - Schwäbisch Gmünd 2015

Fresh cut after nailing - visible erosion prone ground conditions

 - Schwäbisch Gmünd 2015

Hydraulic piling machine used on the project

 - Schwäbisch Gmünd 2015

Installation of the TECCO® SYSTEM3 and anti-erosion mat. Visible piling activity in the background

 - Schwäbisch Gmünd 2015

.

 - Schwäbisch Gmünd 2015

Tallest slope area after hydroseeding

 - Schwäbisch Gmünd 2015

Fully protected slope after hydroseeding. Pile wall visible at the base of the slope.

 - Schwäbisch Gmünd 2015

Revegetation on the fully protected slope during building construction

 

システム

 

設置年

2015

状況

The developer was planning several residential buildings on the hillside north of the river Rems in Schwabisch Gmund (near Stuttgart). The pit was created with a pile wall for excavation support. This area was backfilled after the buildings were completed. In the upper slope area, which remains visible; however, the developer chose to implement a solution that allows revegation.

地質

The slope incision is located in the Stubensandstein layer, and is therefore partly based on stiff loams.

説明

For dimensioning the nail grid pattern global stability was observed and recorded first. In a second step the near-surface instabilities were dimensioned. As is typical for most excavation activity, this slope was excavated from the top down in 1.5 m increments. Immediately following excavation the erosion control mat and TECCO® System were anchored in place with soil nails.

The solution was chosen because:

- Cohesive soils / grounds with an appropriate supply of nutrients for successful revetation,

- Active and immediate greening of the embankment by hydroseeding,

- Through future building the slope will be shaded,

- Four years ago, a similar project using TECCO® System was completed nearby and has shown successful revegetation.

顧客名

((... wil be completed by STS/GRE))

保護対象

建築

腐食防止

ジェオブルッグ スーパーコーティング

下請

Sidla & Schönberger Spezialtiefbau GmbH

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム