スイス
スイス

myGeobrugg

 - Schönegründ B462 2012

.

 - Schönegründ B462 2012

.

 - Schönegründ B462 2012

.

 - Schönegründ B462 2012

.

 

システム

 

設置年

2012

状況

-

説明

Heavy rainfall caused repeated landslips, sending loose masses of earth down onto the B462 highway. The slope was dimensioned with regard to overall stability (lower slip surfaces) and to combat surface instabilities. First of all, several heavily weathered areas of the slope were secured using shotcrete seals. The high-tensile TECCO® System mesh was then combined with the dimensioned nail grid and installed. To protect against lose rockfall from the upper area of the slope, the edge of the TECCO® System mesh was elevated on the mountain side using a bracing rope mounted on posts.

顧客名

Regierungspräsidium Karlsruhe, Dienstsitz Freudenstadt

落札者

Sachtleben Mining Services GmbH, Wolfach

保護対象

道路

エンジニアリング

Ingenieurgruppe Geotechnik, Kirchzarten

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム