スイス
スイス

myGeobrugg

 - Ringelaier Leite St 2127 2015

Single rock stabilization with SPIDER®-System.

 - Ringelaier Leite St 2127 2015

Rockfall triggered by rock scaling.

 - Ringelaier Leite St 2127 2015

Closeup view of the very impressive rock that fell due to rock scaling. Workers were able to successfully remove the rock from the roadway.

 - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

 - Ringelaier Leite St 2127 2015

Partial protection with TECCO® SYSTEM³.

 - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

 - Ringelaier Leite St 2127 2015

Detailed view of SPIDER®-System.

 - Ringelaier Leite St 2127 2015

Excess vegetation must be routinely removed so roots cannot cause increasing amount of pressure and trigger instability in the slope.

 

システム

 

設置年

2015

状況

Some 50 years ago State Road 2127 was widened to accommodate increased traffic volume. Sections of rock face adjacent to the roadway required scaling. The material that was removed was reused as part of the pavement. Because of the stability of the local rock, no protection measures were required.

As a consequence of being moderately to heavily saturated over the past 20 years, crevices in the rock fragments have expanded, in most parts by over one meter. The crevices bisect the steep rock face nearly vertically and caused several rockfall incidents in 2014.

The Bavarian Agency for Environment decided to install several single-block stabilization systems. Further actions have not been planned due to costs and environmental protection.

地質

Quartz / Slate

説明

During rock scaling, those rocks with a volume of up to 6 m³ were removed. Critical sections with reduced stability are now being stabilized with the SPIDER® and TECCO® protection systems.

顧客名

State Administration Passau

落札者

HTB Kufstein

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

IFB Eigenschenk

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム