システム延長

90 m

 

設置年

2021

状況

Following a re-appraisal of the existing landslide protection measures, it was determined that the existing SL-150 and catch pit were insufficient for the volumes and block energies expected in that area.

説明

Working with the geotechnical contractor Geo-Rope, their designer MHB and the client's framework design consultant drew up a solution with a large catch pit at the base of the slope and a customised Geobrugg barrier above the pit. The barrier was customised to have an “open” bottom, with a ring net drape being hung from the lower transmission ropes. The drape's function is to guide landslides and fallen blocks into the catch pit.

国名

イギリス

顧客名

Transport Scotland

エンジニアリング

落札者

下請

保護対象

道路

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Country Manager Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Country Manager Eastern and Central Switzerland

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Country Manager Southern Switzerland

お問い合わせフォーム