スイス
スイス

myGeobrugg

Reconstruction of the National Road D 201-Buzet - GP Požane

 - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Installation of Deltax G80/2 mesh on the cliff.

 - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Drilling for the nails on the cliff.

 - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Testing of the self-drilling anchors.

 

システム

 

設置年

2015

状況

Rockfalls from the cliff were endangering the road below. Because rockfalls are rather small this lightweight solution is ideal.

地質

Limestone cliff with eroded superficial area (causing small rockfalls).

説明

Slope protection with Deltax G80/2.

顧客名

Hrvatske Ceste

落札者

Monterra Rijeka

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Via-ing Pula

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム