スイス
スイス

myGeobrugg

 - Port St Johns Dam Wall Abutment 2018

Stabilized slope

 - Port St Johns Dam Wall Abutment 2018

Works at the steep slope

 - Port St Johns Dam Wall Abutment 2018

View from the dam to the slope during installation works

 

システム

 

設置年

2018

状況

To prevent the possible collapse of rock onto the upstream abutment face of the dam wall, Geobrugg offered a slope stabilization with its TECCO® mesh.

地質

Moderately to highly weathered tillite with closely spaced joints.  The rockmass is prone to ongoing disintegration on exposure to the elements.

説明

After site investigations, a solution with TECCO® mesh was chosen. The mesh is covering an area five meters above the final dam wall height, and eight meters below the full supply level, 15 meters wide at each side of the bullnose.

顧客名

Alpinist Safety Consultants

落札者

Alpinist Safety Consultants

保護対象

インフラ, その他

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

MSJ Geotechnical Consulting Services

その他設置済み工法

斜面・法面対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム