スイス
スイス

myGeobrugg

Point Bonita Lighthouse Pedestrian Bridge

 - Point Bonita Lighthouse Pedestrian Bridge 2012

Point Bonita Lighthouse

 - Point Bonita Lighthouse Pedestrian Bridge 2012

Installed SPIDER S4-230 viewed from above

 - Point Bonita Lighthouse Pedestrian Bridge 2012

Installed SPIDER view of the spike plates

 - Point Bonita Lighthouse Pedestrian Bridge 2012

New Pedestrian Bridge

 

システム

 

システム延長

223 m

 

設置年

2012

状況

In 1954, the U.S. Coast Guard built a suspension footbridge to access the Point Bonita Lighthouse on the outer northwestern point overlooking the Pacific Ocean and San Francisco Bay. Over the years, the bridge had been renovated, but needed to be replaced in 2012. Before a new bridge could be constructed, the rock face needed to be stabilized. The point’s rock mass was fracturing and displaying signs of instability due to years of exposure to harsh marine elements. Stabilization was required to support the weight of a modern bridge without fracturing further.

説明

A stainless steel anchored SPIDER S4-230 mesh system was installed to stabilize the rock face. The diamond shaped net is comprised of three 4 mm wires twisted into a 1x3 strand, with tensile strength of 239 ksi and a diameter of 5/16 inches. As required by the National Park Service, the net was powder coated bronze to better blend with the natural color of the rock mass and further protect against corrosion.

The project won ENR California’s Best Small Project — Construction award in 2012.

顧客名

National Park Service

落札者

AIS Construction (defunct)

保護対象

建築, 観光用インフラ

腐食防止

ジェオブルッグ スーパーコーティング + PET, ステンレス

エンジニアリング

HDR, Inc.

下請

Yeh and Associates, Inc.

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム