スイス
スイス

myGeobrugg

 - Piwniczna Zdrój DW971 2017

Fortified stone wall with TECCO® SYSTEM³

 - Piwniczna Zdrój DW971 2017

Retaining stone wall before stabilization

 - Piwniczna Zdrój DW971 2017

Inobtrusive security with a steel wire mesh

 

システム

 

設置年

2017

状況

The section from Piwniczna to Krynica on the road 971 leads through a mountainous area. In the past retaining stone walls had been built in several sections.

Due to erosion and temperature changes, some walls required stabilization in order to prevent parts of the wall from falling on the road.

説明

A 70 meters long wall was secured with ground nails and a mesh - with TECCO® System.

The solution maintains the stability of the retaining wall without tearing down the old stone wall. The mesh also prevents loose parts from falling on the road.

Check also the Piwniczna Zdrój DW97 rockfall project.

顧客名

ZDW oddział Kraków

落札者

BMD Sp. z o.o.

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

BMD Sp. z o.o.

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム