スイス
スイス

myGeobrugg

 - Perez Caldera 2022

Slope stabilization with TECCO GREEN

 - Perez Caldera 2022

Slope stabilization with TECCO GREEN in Perez Caldera, general view

 - Perez Caldera 2022

The erosion control mat favors revegetation

 - Perez Caldera 2022

The mat retains dust particles and seeds helping, to revegetate the slope

 - Perez Caldera 2022

General view on the stabilized slope.

 - Perez Caldera 2022

Connections of TECCO GREEN mesh rolls

 
 

設置年

2022

状況

Slope stabilization was necessary at the Perez Caldera mining camp. These slopes are on the side of a road that pedestrians and light vehicles use.

説明

The solution defined was installing TECCO GREEN - a mesh system with an erosion control mat- to stabilize, minimize the environmental impact, avoid using shotcrete and allow the revegetation of the slopes.

国名

チリ

顧客名

落札者

Climbers

保護対象

道路, 建築, インフラ

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム