スイス
スイス

myGeobrugg

 - Pech de Foix 2022

Part of the 300 meter long barrier line after finished installation

 - Pech de Foix 2022

Five meter high barrier during installation; the nets attached to the posts can easily be pulled along to upper bearing rope during the installation

 - Pech de Foix 2022

Parts of the detachment zone right above the barrier line

 - Pech de Foix 2022

GBE-3000A rockfall barrier after finished installation

 
 

システム延長

48 m - 72 m

 

設置年

2022

状況

Foix is the chief city of the French department of Ariège. It is located in the valley of the Ariège river, surrounded by the foothills of the Pyrenees. Rockfalls from slopes north of the valley endangered parts of Foix's residential area. Consequently, the municipal administration decided that safety measures are required to preserve the integrity of its inhabitants and their homes.

説明

A total of five rockfall barriers have been installed to protect the area at risk. The entire 300-meter-long barrier line comprises GBE-1000A and GBE-3000A systems. The individual barriers are 48 to 72 meters long, and their heights range between four to five meters. 

顧客名

エンジニアリング

ONF- RTM et SAGE Ingenierie

落札者

下請

CAN

保護対象

居住区

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム