スイス
スイス

myGeobrugg

 - Neckargerach Phase 1 2013

.

 - Neckargerach Phase 1 2013

.

 - Neckargerach Phase 1 2013

.

 - Neckargerach Phase 1 2013

.

 - Neckargerach Phase 1 2013

.

 

システム

 

設置年

2013

状況

Neckargerach is a town located in southwest Germany between Frankfurt and Stuttgart. From time to time landslides occur along the railroad tracks. Geologists scanned the area and worked in close collaboration with Geobrugg to develop possible protection measures. The project areas were prioritized and completed in phases.

説明

In the first phase a total of 1,500 m² of TECCO G65/3 was installed by the construction company Feldhaus. During the drilling and installation above the slope one track at a time was closed while the other line remained operational. The slope was stabilized with boundary rope (wire rope).

顧客名

Deutsche Bahn AG / Anlageplanung Karlsruhe

保護対象

鉄道

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

gbm - NL Ettlingen

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム