スイス
スイス

myGeobrugg

 - Mandai Quarry 2000

Rock wall overview before stabilization works were implemented

 - Mandai Quarry 2000

Rock bolts stake out using man lift

 - Mandai Quarry 2000

Drilling works were executed using a drill rig suspended on a crane

 - Mandai Quarry 2000

Another view on drilling works using a drill rig suspended on a crane

 - Mandai Quarry 2000

Thanks to unique geometry, TECCO® G65/3 high tensile steel mesh retains also gravel or smaller rocks

 

システム

 

設置年

2000

状況

The site is located in an abandoned quarry on the island of Singapore. To protect the entrance and service roads and to make the quarry pit accessible for further use, rock walls of different height, inclination and age had to be stabilized.

地質

Granites.

説明

A substantial part of the works was carried out on walls about 3 decades old and up to 60 meters high. After scaling the slopes from loose boulders, drilling was done either from platforms operated by mobile cranes of by rope access from the top. The whole stabilization works took about one year and was carried out by specialised teams without one single accident.

顧客名

Sembcorp Design and Construction Pte Ltd

落札者

Geobrugg

保護対象

鉱山/採石場

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Geobrugg

その他設置済み工法

落石対策工, 鉱山および採石場

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム