スイス
スイス

myGeobrugg

 - Hydropowerplant Chile I 2016

The barrier and the protected area

 - Hydropowerplant Chile I 2016

During installation

 - Hydropowerplant Chile I 2016

Final installation works

 - Hydropowerplant Chile I 2016

Final installation works

 - Hydropowerplant Chile I 2016

View on the protected tunnel entrance

 - Hydropowerplant Chile I 2016

Lateral view on the RXE-1000 barrier

 - Hydropowerplant Chile I 2016

Protected area, barrier in the background

 

システム

 

システム延長

120 m

 

設置年

2016

状況

In the area of the portal of the VA2 tunnel of the Alto Maipo project, rockfalls caused damage to the surrounding infrastructure and interruptions in operations. It was urgently necessary to find a solution that would allow working in a safe manner.

説明

To retain rocks up to 1000 kJ of energy, Geobrugg proposed the construction of an RXE-1000 rockfall barrier with the following characteristics.

  •     Height:5 meters
  •     Post spacing: 10 meters
  •     Anchors to the mount: 4 meters long
  •     Anchors in the plate, subjected to compression: 4 meters
  •     Anchors in the plate, subjected to traction: 3 meters
  •     Anchors edge: 5 meters
  •     120 linear meters

Engineering and placement of the barriers were carried out by Swiss company Geotest.

国名

チリ

顧客名

Proyecto hidroelectrico Alto Maipo

エンジニアリング

Geotest

落札者

Incolur

保護対象

建築, 鉱山/採石場, インフラ

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Project Manager Sales Eastern Switzerland

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
モニタリングサービス
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム