スイス
スイス

myGeobrugg

 - Hurunui 2024

Looking East - attenuator with fixed posts

 - Hurunui 2024

Looking East - attenuator with fixed posts

 - Hurunui 2024

Looking West - attenuator support rope separation

 - Hurunui 2024

Looking West - attenuator support rope separation

 - Hurunui 2024

Looking West - attenuator with Hurunui river and State Highway 7 (SH7) in the background

 - Hurunui 2024

Attenuator rockfall protection blends into the scenery

 - Hurunui 2024

Fantail Bird liking its new playground - Geobrugg Systems work with nature

 
 

システム延長

100 m

 

設置年

2024

状況

Frequent rockfall onto the Hurunui Bluff Road caused a hazard to the road users.

説明

A fixed post rockfall protection attenuator was installed to redirect and guide rocks down to the toe of the slope. The posts were spaced 15 - 20 metres and placed on the high spots. The drape length was 7 - 9 metres. A support rope separation was installed halfway along, and a bottom rope was installed to control tail kick out. The system was installed efficiently using an excavator drill and Knuckle boom.

国名

ニュージーランド

顧客名

Private

落札者

保護対象

道路

腐食防止

ジェオブルッグ ウルトラコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム